
The Angolan National Petroleum, Gas and Biofuels Agency (ANPG) and Azule Energy announced the successful startup and first oil production from the Agogo FPSO. This is the centrepiece of the Agogo Integrated West Hub (Agogo IWH) project, offshore Angola, which involves the development of two fields, Agogo and Ndungu, in the West Hub of Block 15/06
The Agogo IWH project operated by Azule Energy in Block 15/06, with a 36.84% stake alongside partners Sonangol E&P (36.84%) and Sinopec International (26.32%), is set to add substantial production to Angola’s energy landscape. The Agogo and the Ndungu fields, combined have estimated reserves of approximately 450 million barrels, with projected peak production of 175,000 barrels per day, produced via two FPSOs (Agogo and Ngoma).




