HOME
Join the Community
VIEW SALARIES
Thursday, April 2, 2026
  • Login
  • Register
Oil and Gas World
  • Upstream
    • Exploration
    • Field Development
    • Drilling
    • Subsea
  • EPC
  • FPSO
  • FLNG
  • FSRU
  • LNG
  • Shipping
  • Downstream
  • Zero Carbon
No Result
View All Result
  • Upstream
    • Exploration
    • Field Development
    • Drilling
    • Subsea
  • EPC
  • FPSO
  • FLNG
  • FSRU
  • LNG
  • Shipping
  • Downstream
  • Zero Carbon
No Result
View All Result
Oil and Gas World
  • Home
  • View Salaries
  • Join our Community
ADVERTISEMENT
Home Exploration

PTTEP sets a 5-year investment budget of USD 32,575 million

by Oil and Gas World
December 26, 2023
in Exploration
Reading Time: 3 mins read
0

Bangkok, December 14, 2023 – PTTEP unveiled its 2024 investment plan and a total budget of USD 6,721 million, with a target of a 9% growth in sales volume. The 5-year budget (2024-2028) allocation is at USD 32,575 million with the aim to hike production volume from key projects in Thailand and overseas, while expedite ongoing development projects to commence production as planned.

ADVERTISEMENT

Mr. Montri Rawanchaikul, Chief Executive Officer of PTT Exploration and Production Public Company Limited (PTTEP), revealed that the company adheres to its business strategy to enable sustainable growth, The strategy focuses on 3 main pillars; strengthening the petroleum exploration and production business (Drive Value), reducing Greenhouse Gas (GHG) emissions (Decarbonization) and expanding into new business in preparation for the energy transition (Diversify). To support the execution, PTTEP has set aside a budget of 2024 total expenditure at USD 6,721 million (equivalent to THB 230,194 million), of which USD 4,316 million (equivalent to THB 147,823 million) is allocated for Capital Expenditure (CAPEX) and USD 2,405 million (equivalent to THB 82,371 million) is for Operating Expenditure (OPEX). The key business activities are as follows;

1. Maximizing production volume from existing assets to strengthen Thailand’s energy security. Main producing projects include G1/61 (Erawan, Platong, Satun and Funan fields), G2/61 (Bongkot field), Arthit, S1, Contract 4, the Malaysia–Thailand Joint Development Area (MTJDA), and other major overseas projects. The CAPEX budget of USD 3,202 million (equivalent to THB 109,669 million) is planned to support such activities.

Additionally, there are plans for activities to reduce GHG emissions, with the target of achieving net zero GHG emissions by 2050. This includes lower-carbon E&P portfolio management, the development of technology to reduce GHG emissions from the production process, such as Carbon Capture and Storage (CCS), and the pursuit of emission offseting. The CAPEX budget of USD 109 million (equivalent to THB 3,733 million) is allocated for these activities.

2. Accelerating key projects’ activities which are under development phase such as Lang Lebah field in Malaysia SK410B Project, others development projects in Malaysia and Mozambique Area 1 Project to achieve production start-up timelines as planned, with the allocated budget of USD 762 million (equivalent to THB 26,099 million).

3. Expediting exploration activities to support long-term growth. The CAPEX budget of USD 220 million (equivalent to THB 7,535 million) will be used for the geological studies and the drilling of exploration as well as appraisal wells in Thailand, Malaysia, Oman and the United Arab Emirates.

For 5-year investment plan (2024-2028), PTTEP allocates budget of USD 32,575 million (equivalent to THB 1,083,376 million) with details as the followings.

Apart from the above allocations, PTTEP has ventured into new business for Energy Transition with a provisional budget of approximately USD 2,022 million (equivalent to THB 67,822 million) for the next 5-year period (2024 – 2028). This is to support the investment in offshore renewables, CCS as a Service, hydrogen and the commercialization of PTTEP’s in-house technology and other related businesses, while also ensure the company’s readiness for the energy transition.

In accordance with the investment plan, PTTEP expects its average petroleum sales volume from existing projects between 2024 – 2028, per the details below:

“With regard to the investment plan, PTTEP anticipates an approximately 9% increase in the average petroleum sales volume for 2024. The main contributions to this higher sales volume come from G1/61 Project. For the 5-year investment plan, the company continues to advance the development of key projects to commence petroleum production, aimed at fostering growth. PTTEP is also actively seeking investment opportunities in clean energy across various regions worldwide,” Mr. Montri said.

For the next five years, PTTEP plans to commence natural gas production from Abu Dhabi Offshore 2 Project in 2025 and gas production from Malaysia SK405B Project in 2027. Additionally, the company expects to start gas production from Lang Lebah field in Malaysia SK410B Project, Liquefied Natural Gas (LNG) production from Mozambique Area 1 Project and crude oil production from phase 2 of Algeria Hassi Bir Rekaiz project by 2028.

Tags: pttepthailand
ShareTweetShareSendShareShareSend

Related Posts

Equinor Secures 35 New Production Licenses on the Norwegian Continental Shelf
Exploration

Equinor Secures 35 New Production Licenses on the Norwegian Continental Shelf

January 16, 2026
0

Norwegian energy major Equinor has significantly expanded its offshore portfolio after being awarded 35 new production licenses in Norway’s 2025...

Read moreDetails

CNOOC announced 760 MMBbl Oilfield Discovery in Shallow Neogene Play of Bohai Sea

December 29, 2025

Harbour Energy Strikes $3.2 Billion Deal to Acquire LLOG Exploration, Marking Major U.S. Expansion

December 27, 2025

The Sloanea-1 gas discovery in Block 52 has received commercial field approval from Staatsolie

November 16, 2025

Hess to Relinquish Offshore Suriname Block 59 in July 2025

September 8, 2025

Petrobras reports results of exploratory well in Campos Basin pre-salt

April 19, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

Recommended Stories

PaxOcean Group Delivers Indonesia’s 1st FPSO Conversion

October 27, 2024

BW Offshore has launched a new Floating Desalination Solutions Business called BW Elara

November 15, 2025

QatarEnergy Selected Qatar Gas Transport Company Limited (Nakilat) to Own and Operate 25 LNG Carriers

October 20, 2024

Popular Stories

  • Seatrium delivers P-78 FPSO to Petrobras

    Seatrium delivers P-78 FPSO to Petrobras

    0 shares
    Share 0 Tweet 0
  • MISC Berhad Awarded FPU Contract for Kelidang Field Offshore Brunei

    0 shares
    Share 0 Tweet 0
  • Alam Guyub FLNG Hull Launch Marks Major Milestone for Genting Project

    0 shares
    Share 0 Tweet 0
  • OceanSTAR Elite Wins 15-Year Sepat FPSO Contract from PETRONAS Carigali Offshore Malaysia

    0 shares
    Share 0 Tweet 0
  • Petrobras announced first oil from P-78 FPSO

    0 shares
    Share 0 Tweet 0
Oil and Gas World

Get the latest oil and gas news, energy market updates, industry analysis, and global coverage of upstream, midstream, and downstream sectors.

Recent Posts

  • SBM Offshore Lands Sixth Guyana FPSO Award as ExxonMobil Advances Longtail Development
  • Middle East Escalation Disrupts South Pars and Ras Laffan LNG
  • Iran–Israel War Sends Oil Prices Soaring as Global Energy Markets Brace for Supply Shock
  • OceanSTAR Elite Wins 15-Year Sepat FPSO Contract from PETRONAS Carigali Offshore Malaysia
  • Indonesia Grants Environmental Approval to INPEX’s $20 Billion Abadi LNG Project

Categories

  • Breaking News
  • Digital Technology
  • Downstream
  • Drilling
  • EPC
  • Exploration
  • Field Development
  • FLNG
  • FPSO
  • FSRU
  • LNG
  • Opinion
  • Politics
  • Shipping
  • Subsea
  • uncategorised
  • Upstream
  • Zero Carbon

© 2026 Oil and Gas World. All rights reserved.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Upstream
    • Exploration
    • Field Development
    • Drilling
    • Subsea
  • EPC
  • FPSO
  • FLNG
  • FSRU
  • LNG
  • Shipping
  • Downstream
  • Zero Carbon

© 2026 Oil and Gas World. All rights reserved.

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?