HOME
Join the Community
VIEW SALARIES
Thursday, April 2, 2026
  • Login
  • Register
Oil and Gas World
  • Upstream
    • Exploration
    • Field Development
    • Drilling
    • Subsea
  • EPC
  • FPSO
  • FLNG
  • FSRU
  • LNG
  • Shipping
  • Downstream
  • Zero Carbon
No Result
View All Result
  • Upstream
    • Exploration
    • Field Development
    • Drilling
    • Subsea
  • EPC
  • FPSO
  • FLNG
  • FSRU
  • LNG
  • Shipping
  • Downstream
  • Zero Carbon
No Result
View All Result
Oil and Gas World
  • Home
  • View Salaries
  • Join our Community
ADVERTISEMENT
Home FLNG

JGC Awarded Contract for First Nearshore Floating LNG Plant in Malaysia

by Oil and Gas World
October 20, 2024
in FLNG
Reading Time: 2 mins read
0

JGC Holdings Corporation (Representative Director, Chairman and CEO Masayuki Sato) announced today that JGC Corporation (Representative Director and President Farhan Mujib), which operates the overseas Engineering, Procurement and Construction (EPC) business of the JGC Group, and as the leader of a consortium with Samsung Heavy Industries (SHI), has been awarded the Engineering, Procurement, Construction, Commissioning (EPCC) contract for a nearshore Floating Liquefied Natural Gas (FLNG) facility project in Malaysia planned by Petroliam Nasional Berhad (PETRONAS), the Malaysian oil and gas company.

ADVERTISEMENT

This facility will be the first nearshore FLNG in the world as well as the third floating LNG plant to be constructed for offshore gas fields in Malaysia, with a minimum production capacity of 2 million tonnes of LNG per annum and scheduled for completion in 2027. JGC’s main responsibilities will cover the engineering, procurement and commissioning work for the FLNG topside, the associated onshore facilities, as well as the management of the overall project. As for the consortium partner, SHI will be responsible for the FLNG hull EPC work and the modular fabrication of the topside.

Since the 1980’s, the JGC Group has executed EPC projects for PETRONAS for all nine trains of the LNG plants at the PETRONAS LNG Complex in Bintulu, Sarawak, which has an annual production capacity of approximately 29 million tons per annum, and in 2021 the successful completion of PETRONAS’ second FLNG facility, PFLNG Dua, the world’s first deep-water FLNG facility currently in production.

As a leading global contractor for LNG and Floating LNG projects, the JGC Group also achieved the Mozambique Coral FLNG 1st Cargo in November of this year. The Group’s experience includes two other newly-built EPC FLNG projects out of the total of three in operation around the world, and is currently performing the FEED for an FLNG project in Nigeria.

JGC Holdings Corporation Representative Director, President and COO Tadashi Ishizuka said, “We believe that our consortium secured the order for the PETRONAS FLNG facility project on the basis of JGC’s world-leading project management capabilities and the company’s advanced and proven technologies in LNG plants, accounting for about 30% of LNG plants worldwide, as well as SHI’s world-class shipbuilding capabilities in this field. JGC’s strong leadership backed by excellent project management know-how has been demonstrated during the Front End Engineering Design (FEED) stage.”

Ishizuka went on to say, “It is our sincere wish to continue to contribute to the realization of planned FLNG plants and LNG plants, with LNG positioned as a key energy transition source. In doing so, JGC will leverage its accumulated experience and achievements, founded on an abundance of high-level execution and technical capabilities.”

Tags: flngpetronassabahZLNG
ShareTweetShareSendShareShareSend

Related Posts

ENI and Partners Celebrate Hull Launch of Coral North FLNG in South Korea
FLNG

ENI and Partners Celebrate Hull Launch of Coral North FLNG in South Korea

January 16, 2026
0

San Donato Milanese (Milan), 16 January 2026 — In the presence of Mozambique’s Minister of Natural Resources, Estevão Pale, and...

Read moreDetails
Alam Guyub FLNG Hull Launch Marks Major Milestone for Genting Project

Alam Guyub FLNG Hull Launch Marks Major Milestone for Genting Project

January 16, 2026

JGC Awarded Contract for a Floating Liquefied Natural Gas Project

July 22, 2025

Eni launched the hull for Nguya FLNG bound for Congo

November 23, 2024

Wison New Energies Signed EPCIC Contract with Genting Group

October 20, 2024

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT

Recommended Stories

ExxonMobil Guyana marks five years of oil production

December 27, 2025

QatarEnergy, Excelerate Energy signed 15-Year Agreement to supply 1 MTPA LNG to Bangladesh

February 2, 2024

TotalEnergies will supply 2 million tons of LNG per year to Sinopec for 15 years

November 10, 2024

Popular Stories

  • Seatrium delivers P-78 FPSO to Petrobras

    Seatrium delivers P-78 FPSO to Petrobras

    0 shares
    Share 0 Tweet 0
  • MISC Berhad Awarded FPU Contract for Kelidang Field Offshore Brunei

    0 shares
    Share 0 Tweet 0
  • Alam Guyub FLNG Hull Launch Marks Major Milestone for Genting Project

    0 shares
    Share 0 Tweet 0
  • OceanSTAR Elite Wins 15-Year Sepat FPSO Contract from PETRONAS Carigali Offshore Malaysia

    0 shares
    Share 0 Tweet 0
  • Petrobras announced first oil from P-78 FPSO

    0 shares
    Share 0 Tweet 0
Oil and Gas World

Get the latest oil and gas news, energy market updates, industry analysis, and global coverage of upstream, midstream, and downstream sectors.

Recent Posts

  • SBM Offshore Lands Sixth Guyana FPSO Award as ExxonMobil Advances Longtail Development
  • Middle East Escalation Disrupts South Pars and Ras Laffan LNG
  • Iran–Israel War Sends Oil Prices Soaring as Global Energy Markets Brace for Supply Shock
  • OceanSTAR Elite Wins 15-Year Sepat FPSO Contract from PETRONAS Carigali Offshore Malaysia
  • Indonesia Grants Environmental Approval to INPEX’s $20 Billion Abadi LNG Project

Categories

  • Breaking News
  • Digital Technology
  • Downstream
  • Drilling
  • EPC
  • Exploration
  • Field Development
  • FLNG
  • FPSO
  • FSRU
  • LNG
  • Opinion
  • Politics
  • Shipping
  • Subsea
  • uncategorised
  • Upstream
  • Zero Carbon

© 2026 Oil and Gas World. All rights reserved.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Upstream
    • Exploration
    • Field Development
    • Drilling
    • Subsea
  • EPC
  • FPSO
  • FLNG
  • FSRU
  • LNG
  • Shipping
  • Downstream
  • Zero Carbon

© 2026 Oil and Gas World. All rights reserved.

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?