Laem Chabang Port
Since it’s commencement in 1991, Laem Chabang Port (LCB) has been the leading maritime port for Thailand. As the largest port in Thailand, the deep-water LCB facility has flourished in recent years, becoming a beacon for industries and spurring growth throughout the region. Located 130 kilometers south of the capital Bangkok in the coastal province of Chonburi, the Port Authority of Thailand (PAT) has helped to guide and craft strong development for the port and the surrounding area. The PAT has also helped to encourage a spirit of cooperation between both public and private entities by enabling private terminal operators concessions to manage individual terminal operations at Laem Chabang Port.
Laem Chabang Port has so far undergone two phases of development and is currently in the midst of phase 3.
Phase 1: 1987 – 1998
Construction began in 1987 with the development of Basin 1, and in 1991 operations officially commenced at the site of the first two terminals at the port, B1 and B3. Nine additional terminals were constructed throughout the 1990s.
Basin 1 consists of 11 terminals, including seven container terminals (A2, A3, B1-B5), a multipurpose terminal and a coastal terminal (A0), one passenger terminal (A1), one general cargo terminal (A4) and one car terminal (A5). The depth alongside of Basin 1 is 14 metres. This allows for the handling of vessels of up to 6,500 TEUs.
Basin 1 provides a comprehensive range of services, including cargo handling, warehousing and cargo distribution, pilotage, sewage treatment, garbage collection and disposal, ship repair and vessel maintenance by a floating dockyard with a 140,000 DWT capacity.
Thailand’s fast-growing economy during this period bolstered the cargo volume throughput in Laem Chabang Port, which prompted the Port Authority of Thailand to accelerate the construction of Laem Chabang Port Phase 2 Basin 2.
Phase 2: 1998 – 2008
Phase 2 began in 1998 with the development of Basin 2, which was designed to facilitate the country’s growing container traffic. This phase of Laem Chabang Port’s development sought to strengthen their competitive advantage and transitioning towards becoming an international maritime hub.
Basin 2 is comprised of six container terminals (C1–C3 and D1–D3) and 1 general cargo terminal (C0).
Basin 2 looks to provide a full range of auxiliary services, including a Container Freight Station (CFS) and improved highway connections with Thailand’s hinterland. These developments will greatly increase the attractiveness of Laem Chabang Port as a preferred destination port for shipping lines traversing the Asia-North America and Asia-Europe trade lanes. The depth alongside of Basin 2 is 16 metres and its terminals are capable of handling some of the largest vessels currently in operation.
Phase 3: Future Development
The Port Authority of Thailand (PAT) has already commenced with the Phase 3 development of Laem Chabang Port. The goals are to enhance the port’s competitiveness, to reaffirm its position as the gateway port of the sub-region, to cement its place as a hub for trade, and to ultimately boost Thailand’s investment opportunities.
The PAT has recognized the importance the government has placed on its Eastern Economic Corridor scheme and has set forth initiatives to ensure that Phase 3 integrates with their plans. To do this, the PAT plans to implement and design Phase 3 with state-of-the-art, but environmentally friendly equipment and technology, enabling faster services and reduced waiting times for vessels.
The planned features for Phase 3 include a U-shaped structure that is 800 metres wide and 2,000 metres long. The depth alongside is 18 metres, which allows for the handling of Super-Post Panamax vessels with a capacity of more than 10,000 TEUs. The anticipated capacity for cargo is 8 million TEUs.
Ad blocker detected: Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker on our website.
[Thailand] Laem Chabang
-
- Site Admin
- Posts: 2723
- Joined: Sat Aug 29, 2020 5:40 am
- Location: Singapore
- Contact:
Jump to
- WELCOME TO OIL AND GAS WORLD
- OIL AND GAS NEWS
- ↳ Financial Results
- ↳ Market News
- ↳ Energy Outlook
- ↳ Petroleum Economics and Energy Policy
- ↳ Health, Safety and Environment
- SHIPPING, PORTS & LOGISTICS
- ↳ Shipping
- ↳ Ports & Terminals
- UPSTREAM
- ↳ Seismic, G&G
- ↳ Exploration
- ↳ Drilling & Completion
- ↳ Field Development
- ↳ Subsea Construction & Engineering
- ↳ Decommissioning
- ↳ Field Enhanced Recovery
- ↳ Offshore Services
- MIDSTREAM
- ↳ Pipelines and Subsea Pipelines
- ↳ LNG Terminals
- ↳ Marketing & Trading
- DOWNSTREAM
- ↳ Petrochemicals and Refineries Plants
- ↳ Marketing & Distribution
- ↳ Marine Terminals
- ↳ LNG to Power
- PROJECTS & ASSETS
- ↳ North America
- ↳ Central America
- ↳ South America
- ↳ Barents Sea, Norwegian Sea and Russia
- ↳ North Sea
- ↳ West Africa
- ↳ East Africa
- ↳ North Africa, Mediterranean Sea, Black Sea and Caspian
- ↳ Middle East and the Persian/Arabian Gulf
- ↳ South Asia
- ↳ South East Asia
- ↳ Australia and New Zealand
- ↳ South China Sea
- ↳ East Asia
- TECHNOLOGY
- ↳ FPSO, FPU, FSO, FDPSO, FSRU, FLNG, Jack-Up, Drilling Rigs
- ↳ FPSO/FSO/FPU contracts
- ↳ Altera Infrastructure (Teekay Offshore)
- ↳ BW Offshore
- ↳ SBM Offshore
- ↳ MODEC
- ↳ Yinson
- ↳ Bumi Armada
- ↳ MISC Berhad
- ↳ Rubicon Offshore
- ↳ Samsung Heavy Industries
- ↳ DSME
- ↳ Sembcorp Marine
- ↳ Keppel Offshore & Marine
- ↳ Saipem
- ↳ Bluewater
- ↳ CIMC Raffles
- ↳ KSOE
- ↳ TechnipEnergies
- ↳ CNPC/CPOE
- ↳ MTC Group
- ↳ Drydocks World Dubai
- ↳ Omni Offshore
- ↳ Euronav
- ↳ STX Corporation
- ↳ Petrofac
- ↳ Maersk FPSO
- ↳ COSCO
- ↳ Estaleiros do Brasil Ltda
- ↳ EMAS Offshore
- ↳ COOEC
- ↳ Drilling Rigs Contracts
- ↳ Valaris
- ↳ Transocean
- ↳ Borr Drilling
- ↳ Diamond Offshore
- ↳ Maersk Drilling
- ↳ Seadrill
- ↳ COSL Drilling
- ↳ Noble Drilling
- ↳ ARO Drilling
- ↳ Stena Drilling
- ↳ Northern Drilling
- ↳ Awilco Drilling
- ↳ PV Drilling
- ↳ Odfjell Drilling
- ↳ Shelf Drilling
- ↳ Grupo R
- ↳ Japan Drilling Company
- ↳ Vantage Drilling
- ↳ Bluewhale Offshore
- ↳ Northern Offshore
- ↳ Dolphin Drilling
- ↳ Velesto Energy
- ↳ Türkiye Petrolleri Anonim Ortaklığı (TPAO)
- ↳ Jindall Drilling
- ↳ Northern Ocean
- ↳ Island Drilling
- ↳ Saipem
- ↳ CPOE
- ↳ GSP Offshore
- ↳ ADES
- ↳ Arabian Drilling
- ↳ ADNOC Drilling
- ↳ Ocyan SA
- ↳ OC Offshore
- ↳ Support/Construction/Offshore Vessels
- ↳ DOF Subsea
- ↳ ALP
- ↳ Subsea 7
- ↳ MCDERMOTT
- ↳ POSH
- ↳ Prosafe
- ↳ Floatel
- ↳ Saipem
- ↳ Tidewater
- ↳ Boskalis
- ↳ Siem Offshore
- ↳ OOS International
- ↳ Maersk Supply Service
- ↳ Rig Designs
- ↳ FPSO Designs
- ↳ FLNG, FSRU Designs
- ↳ MODEC
- ↳ Technip Energies
- ↳ JGC
- ↳ Sevan SSP
- ↳ GTT
- ↳ FLNG, FSRU contracts
- ↳ Golar LNG
- ↳ Höegh LNG
- ↳ Excelerate Energy
- ↳ BOTAŞ Petroleum Pipeline Corporation (BOTAS)
- ↳ Samsung Heavy Industries
- ↳ Saipem
- ↳ Sembcorp Marine
- ↳ BW LNG
- ↳ DSME
- ↳ Dynagas
- ↳ MOL
- ↳ Subsea Engineering
- ↳ Turrets and Moorings
- ↳ SOFEC
- ↳ Bluewater
- ↳ SBM Offshore
- ↳ NOV APL
- ↳ DELMAR
- ↳ Remazel Engineering
- ↳ Seasystems
- ↳ London Marine Consultants
- ↳ Drilling, Work-over and Intervention
- ↳ Drilling, Work Over, Intervention, and P&A contracts
- ↳ Helix Energy Solutions
- ↳ Drilling Equipment and System contracts
- ↳ Zero Carbon
- ↳ Process / Packages
- ↳ Digital Technology
- ↳ Other Technology
- ↳ EPCI
- ↳ Asset Lifecycle
- ↳ Marine
- OIL AND GAS JOBS
- ↳ Job Agent: Submit your CV!
- ↳ Offshore Production (FPSO, FSO, FPU, Offshore Platforms)
- ↳ Drilling (Oil Rigs, Land Rigs)
- ↳ EPC Project Management (Fabrication Yards)
- ↳ Petrochemicals and Refineries
- ↳ Tankers & Shipping
- ↳ Onshore
- OIL AND GAS LIFE
- ↳ Jobs & Careers - For a better future
- ↳ Learning Hub - All Technical Stuffs
- ↳ Global Citizen - The World is your Oyster
Who is online
Users browsing this forum: No registered users and 1 guest