[Indonesia] Arun LNG Terminal

escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

[Indonesia] Arun LNG Terminal

Unread post by escveritas »

6 LNG trains with total capacity of 12.5 MTPA

• LPG extraction facility with total capacity of 1.4 MTPA
• Condensate treating facility with total capacity of 120,000 bpd
• 5 LNG tanks with total capacity of 636,000 m3
• 4 LPG tanks with total capacity of 302,000 m3
• 4 Condensate tanks with total capacity of 2.12 million bbl
• 2 LNG jetty, @80,000 DWT
• 1 65,000 DWT LPG jetty