Petrobras will install 11 new pre-salt platforms by 2027
Pre-salt production is expected to reach 2.4 million boe by 2027
Published on 04/09/2023 at 14:05:00
The pre-salt reaches 15 years of production in September with renewed vigor – and significant growth perspective in the coming years. To give you an idea, Petrobrás plans to deploy 11 new production platforms in the pre-salt layer by 2027. Since December 2022, the company has already put into production two new pre-salt systems – P-71 in the Itapu field and FPSO Almirante Barroso, in the Búzios field – and plans to start operating the third unit (FPSO Sepetiba, in the Mero field) by the end of this year. FPSO is the English acronym for floating production storage and offloading platform.
Petrobrás’ Strategic Plan for 2023 to 2027 earmarked USD 64 billion for investments in exploration and production activities. A share of 67% of these funds will be allocated to investments in the pre-salt layer. With the new projects added to the units already in operation, the company is estimated to produce a total of 3 million and 100 thousand barrels of oil equivalent per day (boed) in 2027, with 2.4 million boed coming from the pre-salt layer (Petrobrás’ own share), which will represent 78% of total production. As for the operated production (Petrobrás + partners), it is estimated that the volume produced in the pre-salt layer will reach 3.6 million boe in 2027.
Promising prospects for the Búzios field
The largest field in ultra-deep waters in the world, Búzios has presented excellent results. In June, the field reached an accumulated production of 1 billion barrels of oil equivalent (boe), just five years after starting operations. For comparison, the Marlim field, in the Campos Basin, took 11 years to reach 1 billion boe and the Tupi field, in the pre-salt layer, nine years.
Currently, the Búzios field is operated with five platforms, all FPSO: P-74, P-75, P-76, P-77 and Almirante Barroso. And the future outlook is very positive. Of the eleven new platforms planed for the pre-salt layer by 2027, six will be allocated in Búzios: FPSOs Almirante Tamandaré (planed for 2024); P-78 and P-79 (both for 2025); P-80 and P-82 (both for 2026), in addition to P-83 (2027).
Mero Unitized Field: third largest in the country
Another large pre-salt field is Mero, located in the Libra block, in the Santos Basin. Currently, the Mero field is home to the FPSO Pioneiro de Libra, with a production capacity of up to 50,000 bpd, which operates the Early Production System (Sistema de Produção Antecipada - SPA 2), and the FPSO Guanabara, with a production capacity of up to 180,000 bpd – and which has already reached its production peak about eight months after first oil. The unit achieved a record monthly average production of 179,000 barrels of oil per day (bpd) in February 2023.
In the second half of 2023, Petrobrás expects to deploy the second definitive platform in the Mero field: FPSO Sepetiba, with a production capacity of up to 180,000 bpd. By 2025, the company will put two new units into operation in that field, totaling four systems. Mero is the third largest field in Brazil, after Tupi and Búzios, which are also located in the pre-salt layer of the Santos Basin.
New platforms for the Campos Basin pre-salt
In addition to the Santos Basin, the pre-salt layer continues to expand in the Campos Basin. It was in the Jubarte field, in this basin, that the pre-salt production began 15 years ago. And it is this same field that will receive the FPSO Maria Quitéria in 2025, with a production capacity of up to 100,000 bdp.
At the same time, Petrobrás remains committed to renovate its mature assets in the Campos Basin, expanding its production capacity with the implementation of new systems. The Albacora field, for example, which completed 35 years of operation last year, will receive in 2027 a new FPSO for the Albacora Revitalization project, with a production capacity of up to 120,000 bpd – operating both in the post-salt and pre-salt fields.
Technical capability
“The 15 years of pre-salt production are the best evidence of a Brazil that works. It is a testament to the persistence and technical capabilities of the men and women who fought and did not give up in the face of the complex challenges they encountered. Our technical personnel contributed to the development of unprecedented technologies that made possible to produce in the pre-salt layer, together with our partners, driving the development of an entire market of highly specialized suppliers”, said Petrobrás’ Exploration and Production Officer, Joelson Mendes.
“These professionals not only entered a new frontier, hitherto unexplored, but also made it into one of the most important production spots in the world. And all this success points to a promising future: we are going to put 11 platforms into operation in the pre-salt layer over the next five years that will secure the sustainability of our production – which proves the importance and magnitude of our performance in the pre-salt layer”, added Mendes.
Partnerships
The results achieved in the pre-salt layer – and the promising prospects for the future – are largely due to working in partnership with companies recognized for their technical expertise: Shell, TotalEnergies, Petrogal, Repsol Sinopec, CNOOC, CNODC, Petronas, QatarEnergy and PPSA.
Ad blocker detected: Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker on our website.
Petrobras will install 11 new pre-salt platforms by 2027
-
- Site Admin
- Posts: 3238
- Joined: Sat Aug 29, 2020 5:40 am
- Location: Singapore
- Contact:
Jump to
- OIL AND GAS
- OIL AND GAS INDUSTRY
- ↳ Financial Results
- ↳ Market News
- ↳ Energy Outlook
- ↳ Petroleum Economics and Energy Policy
- ↳ Health, Safety and Environment
- SHIPPING, PORTS & LOGISTICS
- ↳ Shipping
- ↳ Ports & Terminals
- OIL AND GAS UPSTREAM
- ↳ Seismic, G&G
- ↳ Exploration
- ↳ Drilling & Completion
- ↳ Field Development
- ↳ Subsea Construction & Engineering
- ↳ Decommissioning
- ↳ Field Enhanced Recovery
- ↳ Offshore Services
- OIL AND GAS MIDSTREAM
- ↳ Pipelines and Subsea Pipelines
- ↳ LNG Terminals
- ↳ Marketing & Trading
- OIL AND GAS DOWNSTREAM
- ↳ Petrochemicals and Refineries Plants
- ↳ Marketing & Distribution
- ↳ Marine Terminals
- ↳ LNG to Power
- OIL AND GAS PROJECTS & ASSETS
- ↳ North America
- ↳ Central America
- ↳ South America
- ↳ Barents Sea, Norwegian Sea and Russia
- ↳ North Sea
- ↳ West Africa
- ↳ East Africa
- ↳ North Africa, Mediterranean Sea, Black Sea and Caspian
- ↳ Middle East and the Persian/Arabian Gulf
- ↳ South Asia
- ↳ South East Asia
- ↳ Australia and New Zealand
- ↳ South China Sea
- ↳ East Asia
- OIL AND GAS TECHNOLOGY
- ↳ FPSO, FPU, FSO, FDPSO, FSRU, FLNG, Jack-Up, Drilling Rigs
- ↳ FPSO/FSO/FPU contracts
- ↳ Altera Infrastructure (Teekay Offshore)
- ↳ BW Offshore
- ↳ SBM Offshore
- ↳ MODEC
- ↳ Yinson
- ↳ Bumi Armada
- ↳ MISC Berhad
- ↳ Rubicon Offshore
- ↳ Samsung Heavy Industries
- ↳ Hanwha Ocean (fka. DSME)
- ↳ Sembcorp Marine
- ↳ Keppel Offshore & Marine
- ↳ Saipem
- ↳ Bluewater
- ↳ CIMC Raffles
- ↳ KSOE
- ↳ TechnipEnergies
- ↳ CNPC/CPOE
- ↳ MTC Group
- ↳ Drydocks World Dubai
- ↳ Omni Offshore
- ↳ Euronav
- ↳ STX Corporation
- ↳ Petrofac
- ↳ Maersk FPSO
- ↳ COSCO
- ↳ Estaleiros do Brasil Ltda
- ↳ EMAS Offshore
- ↳ COOEC
- ↳ Drilling Rigs Contracts
- ↳ Valaris
- ↳ Transocean
- ↳ Borr Drilling
- ↳ Diamond Offshore
- ↳ Maersk Drilling
- ↳ Seadrill
- ↳ COSL Drilling
- ↳ Noble Drilling
- ↳ ARO Drilling
- ↳ Stena Drilling
- ↳ Northern Drilling
- ↳ Awilco Drilling
- ↳ PV Drilling
- ↳ Odfjell Drilling
- ↳ Shelf Drilling
- ↳ Grupo R
- ↳ Japan Drilling Company
- ↳ Vantage Drilling
- ↳ Bluewhale Offshore
- ↳ Northern Offshore
- ↳ Dolphin Drilling
- ↳ Velesto Energy
- ↳ Türkiye Petrolleri Anonim Ortaklığı (TPAO)
- ↳ Jindall Drilling
- ↳ Northern Ocean
- ↳ Island Drilling
- ↳ Saipem
- ↳ CPOE
- ↳ GSP Offshore
- ↳ ADES
- ↳ Arabian Drilling
- ↳ ADNOC Drilling
- ↳ Ocyan SA
- ↳ OC Offshore
- ↳ Eldorado Drilling
- ↳ Support/Construction/Offshore Vessels
- ↳ DOF Subsea
- ↳ ALP
- ↳ Subsea 7
- ↳ MCDERMOTT
- ↳ POSH
- ↳ Prosafe
- ↳ Floatel
- ↳ Saipem
- ↳ Tidewater
- ↳ Boskalis
- ↳ Siem Offshore
- ↳ OOS International
- ↳ Maersk Supply Service
- ↳ Rig Designs
- ↳ FPSO Designs
- ↳ FLNG, FSRU, FCSU Designs
- ↳ MODEC
- ↳ Technip Energies
- ↳ JGC
- ↳ Sevan SSP
- ↳ GTT
- ↳ Samsung Heavy Industries
- ↳ Bumi Armada
- ↳ DSME
- ↳ Wison Offshore
- ↳ FLNG, FSRU contracts
- ↳ Golar LNG
- ↳ Höegh LNG
- ↳ Excelerate Energy
- ↳ BOTAŞ Petroleum Pipeline Corporation (BOTAS)
- ↳ Samsung Heavy Industries
- ↳ Saipem
- ↳ Sembcorp Marine
- ↳ BW LNG
- ↳ DSME
- ↳ Dynagas
- ↳ MOL
- ↳ Wison Offshore
- ↳ Energos Infrastructure
- ↳ Subsea Engineering
- ↳ Turrets and Moorings
- ↳ SOFEC
- ↳ Bluewater
- ↳ SBM Offshore
- ↳ NOV APL
- ↳ DELMAR
- ↳ Remazel Engineering
- ↳ Seasystems
- ↳ London Marine Consultants
- ↳ Havfram
- ↳ Drilling, Work-over and Intervention
- ↳ Drilling, Work Over, Intervention, and P&A contracts
- ↳ Helix Energy Solutions
- ↳ Drilling Equipment and System contracts
- ↳ Zero Carbon
- ↳ Process / Packages
- ↳ Digital Technology
- ↳ Other Technology
- ↳ EPCI
- ↳ Asset Lifecycle
- ↳ Marine
- OIL AND GAS JOBS
- ↳ Job Agent: Submit your CV!
- ↳ Offshore Production (FPSO, FSO, FPU, Offshore Platforms)
- ↳ Drilling (Oil Rigs, Land Rigs)
- ↳ EPC Project Management (Fabrication Yards)
- ↳ Petrochemicals and Refineries
- ↳ Tankers & Shipping
- ↳ Onshore
- OIL AND GAS LIFE
- ↳ Jobs & Careers - For a better future
- ↳ Learning Hub - All Technical Stuffs
- ↳ Global Citizen - The World is your Oyster
- ↳ North Sea Stories
- ↳ Offshore Norge
- ↳ Middle East Stories
- ↳ Brazil Stories
- ↳ South-East Asia Stories
- ↳ Drilling Rigs
- ↳ FPSOs
Who is online
Users browsing this forum: No registered users and 1 guest