Stena Forth

Post Reply
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Stena Forth

Unread post by escveritas »

Stena Drilling announced that they have signed a new contract with Tullow Oil Suriname BV for the rig Stena Forth to drill 1 well in Block-47, offshore Suriname. The well could very well be the Golaithberg-1 well at Block 47.

The block-47 offshore Suriname forms part of the Suriname-Guyana Basin; located approximately 260 km north of the coast of Suriname.

Stena Forth will mobilise to Suriname in late December 2020/early January 2021 with a planned campaign commencement in January/February 2021.

Image
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: Stena Forth

Unread post by escveritas »

Stena Drilling are pleased to announce that a contract has been signed with CNOOC International Petroleum North America ULC, utilising Mobile Offshore Drilling Unit (MODU) #StenaForth.

The drilling program shall be a one (1) well campaign lasting approximately 90 days offshore #newfoundlandandlabrador in the #FlemishPass. #StenaForth shall mobilise to #Canada with an estimated commencement between April and June 2021.

The region is classified as harsh environment, with water depths ranging from 330 meters to 1,200 meters and unpredictable weather conditions. #StenaForth’s ability for station keeping is essential to allow a safe and efficient completion of the program.

We believe our reputation for #Care, #Innovation and #Performance in everything we do has propelled us to the front for this work, and we look forward to working with CNOOC International to complete this campaign.
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: Stena Forth

Unread post by escveritas »

NEW CONTRACT IN EGYPT FOR STENA FORTH

16 Jan 2023

STENA DRILLING IS PLEASED TO ANNOUNCE THAT WE HAVE SIGNED A NEW CONTRACT WITH BG DELTA LIMITED & BG INTERNATIONAL LIMITED SUBSIDIARIES OF SHELL PLC (SHELL) FOR THE MOBILE OFFSHORE DRILLING UNIT (MODU) STENA FORTH.

The operations for Stena Forth in Egypt are due to commence in 2023 upon completion of existing contractual commitments. The Shell exploration project will entail 3 well drills in the Mediterranean. The project will require Managed Pressure Drilling (MPD) utilising the system owned and installed by Stena Drilling on the Stena Forth.

Stena Drilling is delighted to secure further work with Shell and looks forward to working with Shell to complete a safe, effective and efficient campaign.
Post Reply

Return to “Stena Drilling”

Who is online

Users browsing this forum: No registered users and 3 guests