FSO Cendor (Scrapped)

Unread post by escveritas »

FIELD INFORMATION

Vessel Name FPSO Cendor
Location Cendor Field, Block PM 304 Terengganu, Peninsular Malaysia
Water Depth 70 metres
Field Operator Petrofac Malaysia Limited (PML)

VESSEL INFORMATION

Vessel Owner MISC Berhad
O&M Operator EPOMS
Year Built 1989
Year Converted 2014
Production Capacity (bopd) 150,000
Water Production (bwpd) 35,000
Gas Production (MMscfd) N/A
Total Storage Capacity (bbls) 745,000
Gas Lift (MMScfd) 16
DWT (MT) 63,155
Class Bureau Veritas
Vessel Type Aframax / Single Hull
Mooring System Spread Mooring
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: FSO Cendor

Unread post by escveritas »

FSO Cendor was located 140 km from the east coast of Peninsular Malaysia at Cendor field. The field is operated by Petrofac Malaysia and the facilities consisted of a Mobile Offshore Production Unit (MOPU) and the FSO.

Conversion work took place between October 2005 and September 2006. The FSO was towed out and installed in the Cendor field in September 2006, with first oil received in the same month.

The FSO was spread moored at a water depth of 63 m. She had seven storage tanks with maximum capacity of 75,000 m3 and was equipped with facilities to tandem moor offtake tankers at her bow and stern. Her designed loading rate was 30,000 barrels per day and offloading rate was 14,000 barrels per hour. The FSO was designed to accommodate tankers of between 60,000 and 150,000 summer deadweight tonnes (SDWT).

After a longer than expected operational life of five years, the FSO was demobilised in October 2014 after eight years at site. We are proud to have been the chosen Operations and Maintenance (O&M) operator for the FSO from pre-operations work at the conversion yard and O&M for the entire duration of service from 2006 to 2014 including the demobilisation work for the FSO in 2014.

During the O&M phase, the FSO was operated at an average uptime in excess of 99% with zero lost time injuries recorded during its entire service period.