[Vietnam] FSO Golden Star (2020-2027)

Post Reply
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

[Vietnam] FSO Golden Star (2020-2027)

Unread post by escveritas »

Image

Malaysia Vietnam Offshore Terminal (L) Limited (MVOT)’s FSO Golden Star has successfully received the first condensate for the Sao Vang and Dai Nguyet (SVDN) Project offshore Vietnam on 16 November 2020. MVOT is a 51% MISC Berhad (MISC) owned joint venture with PetroVietnam Technical Services Corporation (PTSC).

FSO Golden Star with a storage capacity of about 700,000 barrels of condensate was successfully converted and sailed away from Malaysia Marine and Heavy Engineering’s West Yard on 10 September 2020 for the SVDN Project in Blocks 05-1b and 05-1c, offshore Vietnam for Idemitsu Gas Production (Vietnam) Co. Ltd.

MISC’s President & Group Chief Executive Officer, Mr. Yee Yang Chien said, “Congratulations to FSO Golden Star for achieving this landmark condensate amidst the challenging and unprecedented global pandemic. I would like to take this opportunity to thank our client- Idemitsu Gas Production (Vietnam) Co. Ltd.for their trust and confidence placed on our team at MVOT. Our sincere appreciation to our joint venture partner - PetroVietnam Technical Services Corporation for the successful collaboration and commitment to deliver the best to our client”.

“To all the project teams and subcontractors, well done and thank you for your dedication and commitment in prioritizing safety throughout the entire project leading to FSO Golden Star’s successful sail away and first condensate. This milestone achievement marks another success for MISC in further expanding the Group’s presence in Vietnam and strengthening its footprint as one of the leading players in providing floating offshore solutions in South East Asia,” he added.

FSO Golden Star is MISC’s 2nd floating asset that operates in Vietnam waters together with FPSO Ruby II. Being converted from the donor vessel YASA Golden Horn, FSO Golden Star is designed to remain in continuous service at the field for a minimum of 7 years without dry docking.
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: FSO Golden Star (2020-2027)

Unread post by escveritas »

FSO GOLDEN STAR receives the first condensate successfully

At 11:00 on 16th November,2020, at Sao Vang Dai Nguyet Field, Block 05-1b & 05-1c offshore Vietnam, the first Condensate fluid arrived on FSO GOLDEN STAR successfully.

Image
FSO Golden Star commenced to open SDV valve at 11:00 hrs on 16th November 2020, and receiving liquid from SV-CPP

This is a milestone marking another success of the EPCI Project deployed by PTSC and partner MISC Berhad, and putting Sao Vang Dai Nguyet Field into operation.

Previously, The FSO, converted at MMHE Shipyard – Malaysia, sailed-away on September 10, 2020, arrived in the Sao Vang Dai Nguyet Field on September 16, 2020 and started the installation, hook-up and commissioning.

Image
FSO at SVDN Field with all systems are fully operational

Image
Post Reply

Return to “MISC Berhad”

Who is online

Users browsing this forum: No registered users and 3 guests