Operated by Chevron on behalf of the Wheatstone Joint Venture, Wheatstone LNG processes gas from the offshore Wheatstone, Iago, Julimar and Brunello gas fields, 220 km from Onslow, Western Australia. Once fully operational, Wheatstone LNG will contribute over 13 MMboe of Woodside's annual LNG and domestic gas production.

Image

Woodside Energy Julimar Pty Ltd (Woodside), is operator of the Julimar Field Production System, located in Commonwealth waters about 160 km north-west of Dampier and adjacent to the Chevron operated, Wheatstone Platform. The Julimar Field Production System includes wells in WA-49-L and flowlines/pipelines in WA-26-PL and WA-29-PL.

Operation of the Julimar Field Production System includes:
• Julimar and Brunello wells (up to 14 wells)
• Inspection, Monitoring, Maintenance and Repair (IMMR) during operations
• Start-up activities for Julimar Development Phase 2

The Julimar Field Production System commenced production in 2016 and operates 24 hours a day, 365 days a year. The Julimar and Brunello fields are predicted to remain active during the life of this EP.

Image
escveritas
Site Admin
Posts: 3216
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: [Australia] Julimar

Unread post by escveritas »

Image

Woodside Energy Julimar Pty Ltd (Woodside), proposes to undertake the following activities for the Julimar Development Phase 2:

• Drill and develop four production wells, connected to a six-slot manifold (‘JULA’).
• Construct an approximately 22 km production flowline and control umbilical extension between the JULA manifold and the existing Brunello Crossover Manifold (BRU-XOM).
• Install and pre-commission subsea hardware and flowline.

The Petroleum Activities Program will be carried out using a moored semi-submersible MODU, pipelay vessel, installation vessels and a variety of support vessels, and is anticipated to commence in Q4 2019 and be completed in 2022. The proposed activities are located within Production Licence WA-49-L, approximately 185 km offshore from Dampier on the north west coast of Western Australia, with the closest landfall being the Montebello Islands, approximately 48km to the south.