Erawan gas field
In April 2022, Mubadala Energy will commence a partner role with a 40-percent participating interest in the G1/61 Erawan gas project, where PTTEP Energy Development Company Limited will be the operator.
Since 1962, Chevron Thailand Exploration and Production, Ltd. has been operating in Thailand with systematic management of safety, health and environment, reliability and efficiency to achieve world-class performance. We supply natural gas, condensate and crude oil for Thailand.
Chevron was the first company to discover and produce natural gas in the Gulf of Thailand over 40 years ago. In 1981, eight years after the discovery of the first commercial natural gas field in the Gulf of Thailand, Chevron’s Erawan field began production. Since then, natural gas has become the major source of energy for electricity generation in Thailand, and it also led to the development of the country’s petrochemical industry.
On 25th April 2022, PTTEP becomes the official operator of the G1/61 project (Erawan, Platong, Satun and Funan fields) and the G2/61 project (the Bongkot field) under the Production Sharing Contract (PSC). The company is geared to execute its work plan in raising the natural gas production rate in support of domestic consumption and national energy security.
Mr. Montri Rawanchaikul, Chief Executive Officer of PTT Exploration and Production Public Company Limited (PTTEP), said that PTTEP assumed operatorship of the G1/61 project and the G2/61 project on April 24, 2022 which marked the first day of the PSC. The company has continued its operatorship in the Bongkot field, and the G1/61 project was transferred from the previous operator to PTTEP. To assure a smooth and safe transition of G1/61 project as well as continuously satisfy national natural gas demand, PTTEP set up a war room at the Headquarter and the production platforms and worked closely with the Department of Mineral Fuels and the former operator of G1/61 project.
"PTTEP has continually upheld and been committed to execute our missions in strengthening national energy security. By assuming the operatorship of these sizable natural gas fields of the country, which are vital sources of energy with combined production capacity of 1,500 million cubic feet per day (MMSCFD) or 60% of the nation’s gas supply, we take pride in being Thailand’s energy company and strive to conduct our energy business for the country and all people the best we can,” Mr. Montri added.
At the G1/61 project, the company’s mission in strengthening national energy security will continue to be carried out by the staff with extensive experience of the fields, primarily supporting this seamless and smooth operation.
On the date of operatorship handover, the natural gas production rate at the G1/61 was at 376 MMSCFD. Due to the absence of continuous development and drilling activity prior to the operatorship transfer to PTTEP, the production rate will gradually decline from the exit rate. PTTEP was previously not allowed to access the site to proceed the preparation work including the drilling campaign as planned, even though the company was granted for site access in late of 2021, it was about two years behind the plan.
Consequently, PTTEP will continue to produce natural gas from remaining resources of the existing production wells with utmost concern on safety and production stability. Therefore, the production rate will initially stay at approximately 250-300 MMSCFD. The company will thereafter execute its plan to ramp up the production rate to 800 MMSCFD within April 2024. Execution plan includes the acceleration of 8 wellhead platforms and subsea pipeline installation, drilling campaign of 183 production wells and procurement of additional 2 drilling rigs for another 52 production wells are all in place. PTTEP will also conduct equipment and system inspections as well as maintenance schedules to ensure the readiness and safety of the petroleum production.
With regards to the G2/61, the production will proceed accordingly to the work plan that sets to produce 700 MMSCFD of natural gas.
In order to meet natural gas demand while the increase of production capacity at the G1/61 project is underway, PTTEP will attempt to boost up the production rates of the Bongkot field, the Arthit project and the MTJDA project by approximately 125 MMSCFD, 60 MMSCFD, and 30-50 MMSCFD, respectively. In total, the production output will be raised by 200-250 MMSCFD to minimize impacts on Thailand.
Ad blocker detected: Our website is made possible by displaying online advertisements to our visitors. Please consider supporting us by disabling your ad blocker on our website.
[Thailand] Erawan Gas Field
-
- Site Admin
- Posts: 3235
- Joined: Sat Aug 29, 2020 5:40 am
- Location: Singapore
- Contact:
Jump to
- OIL AND GAS
- OIL AND GAS INDUSTRY
- ↳ Financial Results
- ↳ Market News
- ↳ Energy Outlook
- ↳ Petroleum Economics and Energy Policy
- ↳ Health, Safety and Environment
- SHIPPING, PORTS & LOGISTICS
- ↳ Shipping
- ↳ Ports & Terminals
- OIL AND GAS UPSTREAM
- ↳ Seismic, G&G
- ↳ Exploration
- ↳ Drilling & Completion
- ↳ Field Development
- ↳ Subsea Construction & Engineering
- ↳ Decommissioning
- ↳ Field Enhanced Recovery
- ↳ Offshore Services
- OIL AND GAS MIDSTREAM
- ↳ Pipelines and Subsea Pipelines
- ↳ LNG Terminals
- ↳ Marketing & Trading
- OIL AND GAS DOWNSTREAM
- ↳ Petrochemicals and Refineries Plants
- ↳ Marketing & Distribution
- ↳ Marine Terminals
- ↳ LNG to Power
- OIL AND GAS PROJECTS & ASSETS
- ↳ North America
- ↳ Central America
- ↳ South America
- ↳ Barents Sea, Norwegian Sea and Russia
- ↳ North Sea
- ↳ West Africa
- ↳ East Africa
- ↳ North Africa, Mediterranean Sea, Black Sea and Caspian
- ↳ Middle East and the Persian/Arabian Gulf
- ↳ South Asia
- ↳ South East Asia
- ↳ Australia and New Zealand
- ↳ South China Sea
- ↳ East Asia
- OIL AND GAS TECHNOLOGY
- ↳ FPSO, FPU, FSO, FDPSO, FSRU, FLNG, Jack-Up, Drilling Rigs
- ↳ FPSO/FSO/FPU contracts
- ↳ Altera Infrastructure (Teekay Offshore)
- ↳ BW Offshore
- ↳ SBM Offshore
- ↳ MODEC
- ↳ Yinson
- ↳ Bumi Armada
- ↳ MISC Berhad
- ↳ Rubicon Offshore
- ↳ Samsung Heavy Industries
- ↳ Hanwha Ocean (fka. DSME)
- ↳ Sembcorp Marine
- ↳ Keppel Offshore & Marine
- ↳ Saipem
- ↳ Bluewater
- ↳ CIMC Raffles
- ↳ KSOE
- ↳ TechnipEnergies
- ↳ CNPC/CPOE
- ↳ MTC Group
- ↳ Drydocks World Dubai
- ↳ Omni Offshore
- ↳ Euronav
- ↳ STX Corporation
- ↳ Petrofac
- ↳ Maersk FPSO
- ↳ COSCO
- ↳ Estaleiros do Brasil Ltda
- ↳ EMAS Offshore
- ↳ COOEC
- ↳ Drilling Rigs Contracts
- ↳ Valaris
- ↳ Transocean
- ↳ Borr Drilling
- ↳ Diamond Offshore
- ↳ Maersk Drilling
- ↳ Seadrill
- ↳ COSL Drilling
- ↳ Noble Drilling
- ↳ ARO Drilling
- ↳ Stena Drilling
- ↳ Northern Drilling
- ↳ Awilco Drilling
- ↳ PV Drilling
- ↳ Odfjell Drilling
- ↳ Shelf Drilling
- ↳ Grupo R
- ↳ Japan Drilling Company
- ↳ Vantage Drilling
- ↳ Bluewhale Offshore
- ↳ Northern Offshore
- ↳ Dolphin Drilling
- ↳ Velesto Energy
- ↳ Türkiye Petrolleri Anonim Ortaklığı (TPAO)
- ↳ Jindall Drilling
- ↳ Northern Ocean
- ↳ Island Drilling
- ↳ Saipem
- ↳ CPOE
- ↳ GSP Offshore
- ↳ ADES
- ↳ Arabian Drilling
- ↳ ADNOC Drilling
- ↳ Ocyan SA
- ↳ OC Offshore
- ↳ Eldorado Drilling
- ↳ Support/Construction/Offshore Vessels
- ↳ DOF Subsea
- ↳ ALP
- ↳ Subsea 7
- ↳ MCDERMOTT
- ↳ POSH
- ↳ Prosafe
- ↳ Floatel
- ↳ Saipem
- ↳ Tidewater
- ↳ Boskalis
- ↳ Siem Offshore
- ↳ OOS International
- ↳ Maersk Supply Service
- ↳ Rig Designs
- ↳ FPSO Designs
- ↳ FLNG, FSRU, FCSU Designs
- ↳ MODEC
- ↳ Technip Energies
- ↳ JGC
- ↳ Sevan SSP
- ↳ GTT
- ↳ Samsung Heavy Industries
- ↳ Bumi Armada
- ↳ DSME
- ↳ Wison Offshore
- ↳ FLNG, FSRU contracts
- ↳ Golar LNG
- ↳ Höegh LNG
- ↳ Excelerate Energy
- ↳ BOTAŞ Petroleum Pipeline Corporation (BOTAS)
- ↳ Samsung Heavy Industries
- ↳ Saipem
- ↳ Sembcorp Marine
- ↳ BW LNG
- ↳ DSME
- ↳ Dynagas
- ↳ MOL
- ↳ Wison Offshore
- ↳ Energos Infrastructure
- ↳ Subsea Engineering
- ↳ Turrets and Moorings
- ↳ SOFEC
- ↳ Bluewater
- ↳ SBM Offshore
- ↳ NOV APL
- ↳ DELMAR
- ↳ Remazel Engineering
- ↳ Seasystems
- ↳ London Marine Consultants
- ↳ Havfram
- ↳ Drilling, Work-over and Intervention
- ↳ Drilling, Work Over, Intervention, and P&A contracts
- ↳ Helix Energy Solutions
- ↳ Drilling Equipment and System contracts
- ↳ Zero Carbon
- ↳ Process / Packages
- ↳ Digital Technology
- ↳ Other Technology
- ↳ EPCI
- ↳ Asset Lifecycle
- ↳ Marine
- OIL AND GAS JOBS
- ↳ Job Agent: Submit your CV!
- ↳ Offshore Production (FPSO, FSO, FPU, Offshore Platforms)
- ↳ Drilling (Oil Rigs, Land Rigs)
- ↳ EPC Project Management (Fabrication Yards)
- ↳ Petrochemicals and Refineries
- ↳ Tankers & Shipping
- ↳ Onshore
- OIL AND GAS LIFE
- ↳ Jobs & Careers - For a better future
- ↳ Learning Hub - All Technical Stuffs
- ↳ Global Citizen - The World is your Oyster
- ↳ North Sea Stories
- ↳ Offshore Norge
- ↳ Middle East Stories
- ↳ Brazil Stories
- ↳ South-East Asia Stories
- ↳ Drilling Rigs
- ↳ FPSOs
Who is online
Users browsing this forum: No registered users and 2 guests