[Brazil] Jubarte and Cachalote (Integrado Parque de Baleias) - FPSO Maria Quitéria

Post Reply
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

[Brazil] Jubarte and Cachalote (Integrado Parque de Baleias) - FPSO Maria Quitéria

Unread post by escveritas »

Malaysia’s Yinson Holdings Berhad has been awarded two letters of intent by Petrobras to supply the FPSO destined for Integrado Parque das Baleias (IPB) in the North Campos Basin offshore Brazil. The contract period is for 22.5 years from the date of the final acceptance and is valued at $5.2 billion. The vessel will be installed in the Jubarte field and is scheduled to start production in the fourth quarter of 2024.



The unit will have the capacity to process 100,000 B/D of oil and 5 million cubic meters of gas per day. The project foresees the interconnection of 17 wells to the FPSO, nine of them oil producers and eight water injectors.

Parque das Baleias, also known as the Whale Park, is a cluster of seven deepwater oil and gas fields offshore Espírito Santo, Brazil. The area includes the Jubarte, Baleia Azul, Baleia Franca, Baleia Anã, Cachalote, Caxaréu, and the Pirambú fields that have both pre-salt and post-salt reserves. The area is estimated to hold more than 2 billion BOE in recoverable reserves.

The IPB FPSO will be Yinson’s second vessel to operate in Brazilian waters, with the first being FPSO Anna Nery, which was chartered to Petrobras in October 2019. It is currently under construction in Cosco Changxing, China, and is on track to be operational in 2023 in the Marlim field located in the northeastern part of the Campos Basin.

Yinson said it and Petrobras have jointly committed to implementing a low-emission design into IPB FPSO, although specifics were not revealed.
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: [Brazil] Integrado Parque de Baleias - FPSO Maria Quitéria

Unread post by escveritas »

escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: [Brazil] Integrado Parque de Baleias - FPSO Maria Quitéria

Unread post by escveritas »

VME awarded contract to support Yinson with FPSO Maria Quitéria

18 July 2022

VME Process Pte Ltd has been awarded by Yinson Bergenia Production B.V. for the supply of 9 process modules and 2 skids for the FPSO Maria Quitéria, Integrado Parque das Baleias Development Project.

Image

“The Maria Quitéria is a great project and we’re excited to be a part of it,” said Chad Tomlinson, Vice President Business Development. “Our global footprint allows us to serve customers like Yinson all over the world.”

The Maria Quitéria FPSO is planned to be located in the Jubarte field, North Campos Basin, where the water depth is up to 1400 meters.

It will accommodate a process plant able to produce 100,000 bbl/d maximum of crude oil, 5,000,000 Sm3/d of gas treatment and compression and 1,000,000 bbl minimum of crude oil storage.

VME’s scope of works includes process design, guarantee, fabrication, inspection and testing, class certification and Brazilian regulatory compliance of a series of modules including Oil Separation, Produced and Sea Water Treatment and Injection, Gas Treatment and Compression.