Liquefied natural gas can be imported using the floating terminals and fed directly into the German gas network. In one unloading procedure, each of the ships can take on up to 170,000 cubic metres of LNG, convert it to a gaseous state on board and then feed it into the gas network.

Thanks to the two 300-metre-long FSRUs, between 10 and 14 billion cubic metres of natural gas can be supplied to the German gas market every year. By way of comparison, the throughput of a permanently installed LNG terminal is between 8 and 10 billion cubic metres per year.