[Brazil] Petrobras 76 (P 76)

Post Reply
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

[Brazil] Petrobras 76 (P 76)

Unread post by escveritas »

DORIS performed FPSO P-76 hull conversion engineering carry over, in order to complete the detail design and classify the converted Hull.

The project mobilized all naval disciplines, project management, process, piping, instrumentation and automation, 3D modeling, safety, mechanical/HVAC, structure, electrical and telecom. DORIS assisted PETROBRAS at the yard during conversion, construction, integration, commissioning, pre-operation for all hull systems.

SERVICES PROVIDED BY DORIS:
  • Engineering Management;
  • Detailed Engineering Carry-over;
  • As Built, Data-Book and Manuals;
  • 3D Modeling;
  • Interface Management
  • Assistance for Construction;
  • Hull Design Review Classification with DNV
  • Site Survey of Hull Completion & Topside Integration


MAIN CHARACTERISTICS:
  • Liquid Processing Capacity 151,000 bbl/d
  • Produced Water Treatment Capacity 151.000 bbl/d
  • Gas Flow and Treatment Capacity 7,000,000 sm3/d
  • Oil Storage Capacity 1,400,000 bbl
  • Water Depth 2,500 m
  • Location Santos Basin
  • Field Buzios III
  • Converted Hull Titan Aires
  • Ship Classification DNV
  • Length Over All 332,00 m
  • Moulded Breath 58,00 m
  • Draft (max/ min) 22.00 m / 7.90 m
  • Dead Weight 261.18 m
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: [Brazil] Petrobras 76 (P 76)

Unread post by escveritas »

Petrobras starts production of P-76, the third platform in the Búzios Field, in the pre-salt of the Santos Basin
20.Feb.2019

Image

Petrobras announces that today it has started the production of oil and natural gas of P-76, the third platform to enter production in the Búzios field.

With a daily capacity to process up to 150,000 barrels of oil and compress up to 6 million cubic meters of natural gas, P-76 will contribute to the growth of the companies' production. It is the second platform to start-up in 2019, out of a total of four planned for this year, in line with Petrobras Strategic Plan.

The Búzios field, in the pre-salt of the Santos Basin, was discovered in 2010 and is the main field under the Transfer of Rights Agreement. The field started production in April 2018, and another platform is expected to start-up this year, the P-77.

The FPSO (floating, production, storage and offloading unit of oil and gas) is located approximately 180 km off the coast of the state of Rio de Janeiro, at a water depth of 2,030 meters. The project provides for its interconnection to ten producing wells and seven injector wells. The offload of oil production will be made by relief vessels, while gas production will be drained through the pre-salt pipeline routes.

The completion of the hull conversion, the integration of the modules and the final commissioning of the unit were carried out in Paraná.