BM-C-33 FPSO

escveritas
Site Admin
Posts: 3218
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

BM-C-33 FPSO

Unread post by escveritas »

20 Jun 2023

REMAZEL ENGINEERING has been awarded a contract by MODEC to supply the complete MOORING TENSIONING SYSTEM for their new-build BM-C-33 FPSO in Brazil.

The mooring system package will be mainly composed by no. 4 Chain Jacks, no. 24 permanent Chain Stoppers and no. 4 Chain Handling Systems. The latter, will be remotely controlled.

“The trust that MODEC is showing us by giving the possibility to contribute to their new FPSO project is the most valuable thing. Then, with this opportunity, we are strengthening even more our presence in Brazil, where we already equipped more than 15 FPSO vessels. This step forward makes us believe even more in our #development project in the area.” Andrea Rosa, CEO of Remazel Engineering.
Post Reply

Return to “Remazel Engineering”

Who is online

Users browsing this forum: No registered users and 1 guest