Page 1 of 1

Munin - Lay up

Posted: Wed Aug 31, 2022 12:19 pm
by escveritas


The FPSO Munin is a unique FPSO, equipped with DP2 (Fully Redundant Dynamically Positioning) system and external turret to hold a quick disconnectable buoy system for supporting the oil/gas risers. The FPSO is also equipped with a Disconnectable Turret Mooring System to allow conventional mooring. The FPSO has operated successfully in the Lufeng field, Xijiang field and Huizhou field, all located in the South China Sea.

The high flexibility of the FPSO is proven at the Xijiang and Huizhou projects, where the FPSO operated for more than 3 years on full Dynamic Positioning with oil production rates exceeding 90,000 bbl/d.

Presently, the FPSO is at anchorage near Labuan, Malaysia, directly available for redeployment.

Re: Munin - Lay up

Posted: Wed Aug 31, 2022 12:22 pm
by escveritas