Page 1 of 1

Kvitebjørn gas export

Posted: Tue Sep 08, 2020 6:51 am
by escveritas
Gas transport from Kvitebjørn to Kollsnes.
Deliveries from the Kvitebjørn field in the northern North Sea began in October 2004, with rich gas piped through the Kvitebjørn gas export line to the Kollsnes processing plant. Condensate is sent to Mongstad via Troll oil pipeline II.

After the natural gas liquids have been extracted at Kollsnes, dry gas is piped on to market through Norway’s integrated gas transport system. Gassco is operator for the Kvitebjørn gas export line.

From: Kvitebjørn platform
To: Kollsnes
Length:147 km
Diameter: 30"
Available technical capacity (ATC)*: 27 MSm3/d
Technical Service Provider (TSP): Equinor
Operator: Gassco
Gassled: Area G

* ATC (Available Technical Capacity) is rounded to the nearest whole number [MSm³/d]. The actual transport capacity, available for potential users of these pipelines, could be influenced by pressure dependencies between different pipelines, temperature, gas quality, operational constraints etc.