Norne Gas Transport

escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Norne Gas Transport

Unread post by escveritas »

The Norne Gas Transport System (NGTS) ties the Norne field in the Norwegian Sea into the Åsgard Transport pipeline.
The pipe runs for 126 kilometres and has a diameter of 16 inches. Norne Gas Transport System became operational in February 2001.

The NGTS became part of the Gassled joint venture on 1 January 2009.

From: Norne-feltet
To: Åsgard Transport (Gassled område B)
Length: 126 km
Diameter: 16"
Available technical capacity (ATC)*: 7 MSm3/d
Technical Service Provider (TSP): Statoil
Operator: Gassco
Gassled: Area H

* ATC (Available Technical Capacity) is rounded to the nearest whole number [MSm³/d]. The actual transport capacity, available for potential users of these pipelines, could be influenced by pressure dependencies between different pipelines, temperature, gas quality, operational constraints etc.
Post Reply

Return to “Pipelines and Subsea Pipelines”

Who is online

Users browsing this forum: No registered users and 6 guests