The Europipe II pipeline is 658 kilometres long and has a diameter of 42 inches.
It transports gas from the Kårstø processing complex north of Stavanger to the receiving facilities at Dornum in northern Germany.

From: Kårstø
To: Dornum, Tyskland
Length: 658 km
Diameter: 42"
Available technical capacity (ATC)*: 71 MSm3/d
Technical Service Provider (TSP): Statoil
Operator: Gassco
Gassled: Area D

* ATC (Available Technical Capacity) is rounded to the nearest whole number [MSm³/d]. The actual transport capacity, available for potential users of these pipelines, could be influenced by pressure dependencies between different pipelines, temperature, gas quality, operational constraints etc.