[India] KG-DWN 98/2 - FPSO Armada Sterling V

Post Reply
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

[India] KG-DWN 98/2 - FPSO Armada Sterling V

Unread post by escveritas »

Shapoorji Pallonji Bumi Armada Godavari Private Limited (SPBAG), a subsidiary of Shapoorji Pallonji Oil and Gas Private Limited (SPOGL) has been awarded the CHARTER HIRE contract for provision of a Floating Production Storage & Offloading (FPSO) by Oil and Natural Gas Corporation Limited (ONGC) on May 02, 2019. The FPSO will be positioned in KG-DWN 98/2 field, approximately 22 Km off the east coast of Kakinada, India. The primary operational period is nine years and may further be extended up to seven years on an annual basis at the discretion of ONGC.





The proposed FPSO will be a Very Large Crude Carrier (VLCC) conversion with capability of handling 50,000 barrels of oil per day and 2.96 MMSCMD of gas and with sea water injection capacity of 50,000 barrels of water per day. The FPSO will be equipped with an internal turret designed for monsoon conditions prevalent at the field. The FPSO is scheduled to be delivered in 2022.

This is the largest FPSO Contract awarded by ONGC and secured by the Shapoorji Pallonji Group.
escveritas
Site Admin
Posts: 3181
Joined: Sat Aug 29, 2020 5:40 am
Location: Singapore
Contact:
Singapore

Re: [India] KG-DWN 98/2 - FPSO Armada Sterling V

Unread post by escveritas »

Post Reply

Return to “South Asia”

Who is online

Users browsing this forum: No registered users and 1 guest