Shah Deniz

Unread post by escveritas » Mon Jan 21, 2019 9:42 am

Shah Deniz has been and still is BP’s largest discovery since Prudhoe Bay

Image

The Shah Deniz (SD) field was discovered in 1999. It is one of the world’s largest gas-condensate fields. It is located on the deep water shelf of the Caspian Sea, 70 km south-east of Baku, in water depths ranging from 50 to 500 m.

BP operates Shah Deniz on behalf of its partners in the Shah Deniz Production Sharing Agreement (PSA).

Shah Deniz is structured as an unincorporated Joint Venture (JV) partnership. BP is the operator of the Shah Deniz JV.

Shah Deniz Stage 1 began operations in 2006. It has the capacity to produce around 10 billion cubic meters of gas per annum (bcma) and approximately 50,000 barrels a day of condensate.

Despite the complexities of drilling the wells, building a platform, constructing an onshore terminal and laying a 700 km South Caucasus pipeline (SCP) through Azerbaijan and Georgia to the Turkish border, Shah Deniz Stage 1 was developed in only seven years. Since Shah Deniz has proved a secure and reliable supplier of gas to Azerbaijan, Georgia and Turkey.

During 2014, the existing Shah Deniz facilities were further de-bottlenecked which increased their production capacity from 27.3 million standard cubic metres to 29.5 million standard cubic metres of gas per day.

In the first half of 2018, the Shah Deniz field continued to provide deliveries of gas to markets in Azerbaijan (to SOCAR), Georgia (to GOGC), Turkey (to BOTAS) and to BTC Company in multiple locations.

During the first six months of the year, the field produced 5 billion standard cubic metres (bcm) of gas and 1.1 million tonnes (9 million barrels) of condensate.

The existing Shah Deniz facilities’ production capacity is currently 32.0 million standard cubic metres of gas per day or around 10.9bcma.

escveritas
Site Admin
Site Admin
Posts: 135
Joined: Sun Jan 13, 2019 3:17 pm

Re: Shah Deniz

Unread post by escveritas » Mon Jan 21, 2019 10:19 am

Shah Deniz stage 2

Shah Deniz Stage 2, or Full Field Development (FFD) is a giant project that will add a further 16 billion cubic meters per year (bcma) of gas production to the approximately 10 bcma produced by Shah Deniz Stage 1.

Around $28 billion in capital investment will be required to produce the gas and transport it to the Georgia-Turkey border. From there, additional pipeline systems will deliver 6 bcma of gas to Turkey and a further 10 bcma of gas to markets in Europe, in a route known as the Southern Gas Corridor. Shah Deniz gas will travel 3,500 kilometres, to elevations of over 2,500 metres, and over 800 metres below the sea.

Shah Deniz Stage 2, one of the largest gas developments in the world, will help increase European energy security by bringing Caspian gas resources to markets in Europe for the very first time.

The current concept for Shah Deniz Stage 2 includes:
  • 2 new bridge-linked offshore platforms.
  • 26 gas production wells which will be drilled with 2 semi-submersible rigs.
  • 500 km of subsea pipelines will link the wells with the onshore terminal.
  • Upgrade of the offshore construction vessels
  • Expansion of the Sangachal terminal to accommodate the new gas processing and compression facilities.
Image

After achieving significant commissioning and completion milestones across the whole gas value chain during the first half of the year, the Shah Deniz 2 and South Caucasus Pipeline Expansion (SCPX) system entered the start-up phase with the official inauguration event held at the Sangachal Terminal on 29 May. This was followed by the commencement of commercial gas deliveries to Turkey from the Shah Deniz 2 development project as planned on 30 June 2018. The Shah Deniz 2 project is being delivered safely, on schedule and within budget.

In parallel, during the first half of 2018, hook-up and commissioning activities continued on the Shah Deniz Bravo platform. The testing of the subsea flowlines and wells is complete. The Bravo facilities have entered the operational phase.